The US Bank Stadium is an enclosed stadium located in downtown Minneapolis, Minnesota, and is the home of the Minnesota Vikings of the National Football League (NFL). The stadium was built on the former site of the Hubert H. Humphrey Metrodome, which collapsed for the fifth time in 2013, and opened in July 2016. The construction of the stadium began in late 2013 and was completed in just over two and a half years, six weeks ahead of schedule, setting a new standard for sports facilities.

Characteristics Values
Location Downtown Minneapolis, Minnesota
Construction began December 2013
Cost $975 million to $1.1 billion
Opened July 2016
Capacity 65,400 to 72,000
Features Fixed, slanted roof, 60% transparent; black zinc façade; 160-foot long legacy Vikings ship with a 2,000 square foot curved LED videoboard; 430 concessions, gift shops, restaurants, and a Vikings museum and Hall of Fame
Construction time 2.5 years
Construction workers 8,000

bankshun

US Bank Stadium opened in July 2016

US Bank Stadium, the home of the Minnesota Vikings, officially opened on July 22, 2016, with a two-day public open house that welcomed over 190,000 visitors through its doors. The stadium, which cost $975 million to build, is located in downtown Minneapolis, Minnesota, on the former site of the Hubert H. Humphrey Metrodome, which was the Vikings' home from 1982 until its closure in 2013. The Metrodome was demolished in early 2014, and construction on the new stadium began in December of that year.

The US Bank Stadium project was completed in just over two and a half years, six weeks ahead of schedule, and it is the largest construction project in Minnesota history. The stadium features a fixed, slanted roof that is 60% transparent, allowing natural light to filter inside and giving it an outdoor feel. The building also boasts a black zinc façade, with most fans entering through the west side, known as the Medtronic Plaza. This side features a 160-foot-long legacy Vikings ship, modelled after an ancient Viking ship, with a 2,000-square-foot curved LED videoboard serving as its sail.

The stadium has seven levels, including two general admission concourses with 360-degree circulation and various views of the bowl. It offers up to 116 suites and 8,000 club seats, some of which are closer to the sideline than at any other NFL stadium. The US Bank Stadium also has 430 concessions, gift shops, restaurants, and a Vikings museum and Hall of Fame. The stadium can seat up to 65,400 fans for regular events and can expand to accommodate 72,000 people for major events.

The Vikings played their first preseason game at the new stadium on August 28, 2016, and their first regular-season home game on September 18, 2016, against the Green Bay Packers, which they won 17-14. The stadium has since hosted major events such as the Super Bowl in 2018 and the NCAA Final Four in 2019.

bankshun

The stadium is home to the Minnesota Vikings

The US Bank Stadium is the home of the Minnesota Vikings of the National Football League (NFL). The Vikings have been a part of the Minnesota sports scene since 1961, but they have never had a stadium of their own. They shared stadiums with baseball's Minnesota Twins until 2010. In the early 2000s, the Vikings lobbied for support from the State of Minnesota to fund the construction of a new stadium.

On March 1, 2012, Minnesota Governor Mark Dayton announced that a new stadium would be built on the site of the Metrodome, with half of the $975 million project cost being publicly funded. The Vikings played at the TCF Bank Stadium for two seasons while the Metrodome was demolished and their new stadium was constructed.

US Bank Stadium opened in July 2016, with the Vikings playing their first game there on September 18, 2016, against the Green Bay Packers. The stadium has a unique design, with a fixed, slanted roof that is 60% transparent, allowing natural light to filter inside and giving it an outdoor feel. The majority of fans enter the stadium through the west side, known as the Medtronic Plaza, which features a 160-foot-long legacy Vikings ship with a 55-foot-tall sail made from a curved LED video board.

The stadium has a capacity of up to 65,400 fans and can expand to accommodate 72,000 people for major events. It has seven levels, including two general admission concourses with 360-degree circulation and various views of the bowl. There are up to 116 suites and 8,000 club seats, 430 concessions, gift shops, restaurants, and a Vikings museum and Hall of Fame. The stadium also features state-of-the-art technology, including high-quality HD video boards and a robust network with high upload and download speeds for fans.

bankshun

It cost $975 million to build

US Bank Stadium, the home of the Minnesota Vikings, was completed in July 2016. The stadium is the largest construction project in Minnesota history, with a price tag of $975 million. The cost of building such a large-scale project is naturally high, but the bill was split between the Vikings, the City of Minneapolis, and the State of Minnesota. The Vikings covered $477 million, the state contributed $348 million, and $150 million came from a hospitality tax in Minneapolis.

The stadium was built on the site of the former Metrodome, which had been the home of the Vikings from 1982 until its closure in 2013. The Metrodome collapsed for the fifth time in 2013, which finally led to the construction of a new stadium. The groundbreaking ceremony for the US Bank Stadium took place on December 3, 2013, and construction was completed in just over two and a half years, six weeks ahead of schedule.

The project was not without its critics, with some arguing that it placed an unfair burden on taxpayers and gave too much to team owners. However, the stadium has brought many benefits to the area, including spurring $1 billion in surrounding development, including office space, retail, residential units, and a green space. The project also achieved high workforce participation and local business involvement, creating over 8,000 construction jobs.

The US Bank Stadium has a unique design, with a fixed, slanted roof that is 60% transparent, allowing natural light to filter inside and giving it an outdoor feel. The stadium also features a black zinc façade, with most fans entering through the west side, known as the Medtronic Plaza. This side features a 160-foot-long legacy Vikings ship, complete with a 2,000-square-foot curved LED videoboard serving as the ship's sail. The stadium has a capacity of up to 65,400 fans and can expand to accommodate 72,000 people for major events.

bankshun

It's the largest construction project in Minnesota's history

Construction on the US Bank Stadium began in December 2013, with the stadium officially opening its doors on July 22, 2016. With a construction cost of $1.129 billion, it is considered the largest construction project in the history of Minnesota. The stadium is the home of the Minnesota Vikings NFL franchise and replaced the team's previous home, the Hubert H. Humphrey Metrodome.

The scale of the project was immense and involved the work of thousands of construction workers and specialists. The stadium covers an area of 1.75 million square feet and has a unique design featuring an ETFE roof and five large glass doors that offer stunning views of downtown Minneapolis. The project also included the construction of a new parking facility with 2,400 spaces and the renovation of existing parking facilities to accommodate a total of 20,000 parking spaces for game days.

The stadium boasts a seating capacity of 66,655, including 70 suites and 8,000 club seats, providing an unparalleled game-day experience for fans. The project also incorporated the latest technology, including a state-of-the-art video board, sound system, and LED lighting. The stadium also features a variety of premium amenities, such as exclusive clubs and lounges, offering an enhanced game-day experience for fans.

The US Bank Stadium is not just a venue for sports but also a versatile event space. The design and construction considered the ability to host a range of events, from large-scale concerts to intimate gatherings. The stadium has hosted major events, including the Super Bowl LII in 2018 and the ESPN X Games in 2017 and 2018, showcasing its versatility and capacity to cater to a diverse range of events.

The construction of the US Bank Stadium had a significant impact on the local economy, creating thousands of jobs and generating revenue for the region. The project also spurred further development in the surrounding area, with new hotels, restaurants, and entertainment venues springing up to cater to the increased foot traffic. The stadium has become a landmark in Minneapolis and a source of pride for the entire state of Minnesota.

Bank Drafts: How Long Are They Valid?

You may want to see also

bankshun

The stadium has a unique, transparent ETFE roof

The US Bank Stadium, located in downtown Minneapolis, Minnesota, is the home of the Minnesota Vikings of the National Football League (NFL). The stadium was constructed in 2013 and opened in July 2016, with the Vikings playing their first game there on September 18, 2016, against the Green Bay Packers.

The construction of the US Bank Stadium set a new standard for sports facilities, boasting a bold and iconic design. The project achieved impressive workforce participation and local business involvement, exceeding its established goals. Over 8,000 workers dedicated more than four million hours to the project, with up to 1,500 workers on-site simultaneously.

The stadium features a black zinc facade, with the majority of fans entering through the west side, known as the Medtronic Plaza. This three-acre gateway showcases one of the stadium's most iconic features: a 160-foot-long legacy Vikings ship, complete with a 2,000-square-foot curved LED videoboard serving as its sail.

The US Bank Stadium has enhanced the fan experience with its robust technology infrastructure. It boasts 1,600 DAS antennas, 300 amplifiers, and over 47 miles of fiber optic cable, enabling high-speed uploads and downloads for nearly 70,000 fans. The stadium has a seating capacity of up to 65,400, with the ability to expand to 72,000 for major events.

Frequently asked questions

Construction of the US Bank Stadium began in December 2013 and was completed in July 2016.

The US Bank Stadium was built in two and a half years, six weeks ahead of schedule.

The US Bank Stadium was built at a cost of $975 million, half of which was publicly funded.

Written by
Reviewed by

Explore related products

Share this post
Print
Did this article help you?

Leave a comment